Informative translation. In case of discrepancies, the Latvian version prevails.

General terms

for the sale and installation of windows and other structures (consumer contracts)

Version V1, effective from 17.11.2026. This is the current version; the version stated on the contract page (in the Individual Terms) applies to the contract.

These General Terms, together with the Individual Terms (the contract page), the Specification and the annexes, form the Contract between SIA «Saens» (hereinafter — the Contractor) and a private person (hereinafter — the Consumer) who concludes the Contract for purposes not related to their trade or profession. The Individual Terms (price, Products, deadlines, payment schedule, warranty periods, details of the Contractor and the Consumer) are stated on the contract page. If the Individual Terms conflict with these General Terms, the Individual Terms prevail, unless they worsen the Consumer’s rights provided by law. In the Individual Terms the Consumer confirms that before signing the Contract they received and read the stated version of these General Terms.

1. Subject of the Contract

1.1. The Contractor undertakes to manufacture (order from the manufacturer) and hand over to the Consumer the windows, doors or other structures stated in the Individual Terms and the Specification (hereinafter — the Products), and the Consumer undertakes to accept the Products (and the work performed) and pay the Contract price. In the Individual Terms the Parties choose the content of the Contract: (a) delivery and installation; (b) delivery without installation; (c) collection of the Products from the Contractor’s warehouse without delivery and installation. Services that are not chosen are not part of the Contract. The Products are intended for installation at the address stated in the Individual Terms (hereinafter — the Site).

1.2. The quantity and dimensions of the Products, the profile system, the type of glazing units, hardware, colour, additional accessories (sills, drip caps, insect screens, blinds, etc.) and the scope of installation work are stated in the Specification (Individual Terms). The Specification has been prepared on the basis of the measurements and the Consumer’s wishes and is an integral part of the Contract.

1.3. The Contract combines elements of a sale contract and a contract for work (Section 2212 of the Civil Law). The relations of the Parties are governed by the Consumer Rights Protection Law (hereinafter — CRPL), Cabinet Regulations No. 254 and No. 255 (depending on how the Contract is concluded) and the Civil Law. The terms of the Contract do not limit the Consumer’s rights provided by law; a term that conflicts with the law is not applied, and the rest of the Contract remains in force.

1.4. If installation is provided for in the Individual Terms, its scope includes only the work marked «yes» in the Individual Terms or the Specification: dismantling of the old window; removal and disposal of old windows and construction waste; installation of the Products; sealing of installation joints (outer and inner layer); installation of sills and drip caps; inner / outer window reveals; adjustment of hardware; cleaning of the work area. Unless the Specification states otherwise, the price does not include plastering, painting, tiling and other finishing work, relocation of utilities and repair of the substrate if the substrate was damaged before the work began. If installation is not provided for, dismantling, disposal and finishing work are also not included in the Contract, and Chapter 4 does not apply.

1.5. The Products are made to individual dimensions and the Consumer’s instructions (goods made to order). Before signing the Contract the Contractor informed the Consumer how this affects the right of withdrawal from the Contract (Chapter 7).

1.6. The Contractor may engage subcontractors and is responsible for their actions as for its own. The Products must comply with the European standard LVS EN 14351-1 and the requirements of other applicable legal acts; upon acceptance the Contractor hands over to the Consumer the declaration of performance (DoP) and/or the CE marking (where applicable), the Product passport and the user and care instructions in Latvian (on request — also in Russian).

2. Price and payment procedure

2.1. The total price of the Contract (including VAT unless the Individual Terms state otherwise) is stated in the Individual Terms. The price includes all taxes and fees and consists of the price of the Products and — if chosen — installation, dismantling and disposal, as well as delivery costs. The Contractor does not charge additional payments of which the Consumer was not informed before signing the Contract.

2.2. The price is fixed and the Contractor may not raise it unilaterally. The price may be changed only by written agreement of the Parties (for example, if the Specification is changed at the Consumer’s request or circumstances are discovered during dismantling that could not have been noticed during measuring). If the price changes, before starting work the Contractor submits a justification and a revised estimate; the Consumer is entitled to disagree and terminate the Contract in accordance with clause 2.6.

2.3. Payment is made in stages in the amounts and by the deadlines stated in the Individual Terms: (1) an advance when the Contract is signed, for placing the order into production; (2) a prepayment before delivery or collection of the manufactured Products; (3) the final payment after the Acceptance Certificate is signed. The advance is part of the price and is not a contractual penalty or a security deposit.

2.4. Payment is made by bank transfer to the Contractor’s account LV42HABA0551053862294, Swedbank AS, stating the Contract number, or in cash against a receipt / cash receipt if the Individual Terms so state. A payment is considered made on the day the money is credited to the Contractor’s account. The Contractor issues an invoice (receipt) for each payment.

2.5. The Contractor is entitled to suspend performance (not to deliver the Products, not to start installation) if the Consumer has not made a scheduled payment, having warned the Consumer in writing and set a deadline of at least 5 working days. Performance deadlines are extended by the period of suspension.

2.6. Refund of the advance on termination of the Contract:

  • if the Contract is terminated through the Contractor’s fault, on its initiative without fault of the Consumer, or if the Consumer does not agree to the new price (clause 2.2), the Contractor refunds all amounts received from the Consumer without deductions within 14 days of the termination date;
  • if the Consumer withdraws from the Contract on their own initiative without a breach by the Contractor, the Contractor deducts from the advance only the documented actual costs of manufacturing the Products to order and of work already performed, but not more than the amount of the advance, and refunds the balance within 14 days. The Contractor justifies the deducted amount with a calculation and gives it to the Consumer in writing.

2.7. For late payment the Consumer pays a contractual penalty of 0.1 % per day of the overdue amount, but not more than 10 % of that amount. The Contractor pays the Consumer a penalty of the same amount on the same terms for late delivery or installation (clause 3.4) and for late refunds.

3. Deadlines, measuring, manufacturing and delivery

3.1. Measuring at the Site is carried out by the Contractor within the period stated in the Individual Terms. The Consumer confirms the dimensions, opening scheme, colour and glazing units by signing the Specification before manufacturing starts. If the Consumer provided the dimensions themselves, the Contractor must check them within reasonable limits and warn of obvious discrepancies.

3.2. Performance deadlines (manufacturing, delivery or readiness for collection, installation, final completion date) are stated in the Individual Terms. The manufacturing period is counted from the later of the following events: the Specification is signed, the advance is paid.

3.3. If delivery or installation is provided, the Contractor agrees the exact date and time with the Consumer at least 3 working days in advance. Rescheduling at the initiative of either Party — at least 24 hours in advance (without sanctions, unless the rescheduling is connected with a breach of the Contract). If the Products are collected from the warehouse, the Contractor announces readiness for collection, and the Parties agree the collection time at least 3 working days in advance.

3.4. If the Contractor has missed the delivery or installation deadline, the Consumer is entitled to set a reasonable additional period (of at least 14 days) and, if it is not met, to terminate the Contract in accordance with clause 2.6. Penalty and compensation for losses — in accordance with clause 2.7 and Chapter 8.

3.5. If delivery is provided, the Contractor delivers the Products to the Site at its own expense (the costs are included in the price) and unloads them at the entrance to the Site. If the Products are collected, the Consumer collects them from the Contractor’s warehouse at the address stated in the Individual Terms, the Consumer arranges and pays for loading and transport, and the risk passes to the Consumer when the Acceptance Certificate is signed. Upon receiving the goods the Consumer (or a person authorised in writing) checks the completeness and visible damage in the presence of the Contractor’s representative; remarks are written in the Certificate or delivery note. Hidden defects that cannot be noticed in a brief inspection do not deprive the Consumer of rights under Chapter 6.

3.6. If through their own fault the Consumer has not provided access to the Site at the agreed time, the performance deadlines are extended by the period of downtime. A repeat visit is paid in the amount stated in the Individual Terms if the Consumer was warned about it in writing in advance.

3.7. If through their own fault the Consumer does not accept the finished Products for more than 14 days after the notice of readiness, the Contractor is entitled to store them in the warehouse and to claim reasonable, documented storage costs.

4. Installation

  • This chapter applies only if installation has been chosen in the Individual Terms.

4.1. The Contractor performs installation with quality, observing the technology of the profile system and installation material manufacturers, the Latvian building regulations in force (including the thermal performance of external enclosing structures, where applicable) and occupational safety requirements, making a three-layer installation joint (outer moisture-resistant — thermal insulation — inner vapour barrier layer) if such installation is provided for in the Specification.

4.2. Installation is carried out by qualified employees of the Contractor or its subcontractors.

4.3. Before installation begins the Consumer: (a) ensures free access to the window openings, clears the sills and the work area, covers or removes furniture, fragile and valuable items; (b) provides 230 V power supply and the possibility to park / receive transport; (c) informs the Contractor about hidden utilities in the walls and known defects of the openings; (d) is responsible for obtaining consents and permits where they are needed for replacing windows (a decision of the general meeting of apartment owners or the consent of co-owners; documents for the building authority if the division, proportions or colour of facade windows are changed, as well as in cultural monument protection zones). The Consumer guarantees that they are the owner of the Site or have the owner’s consent. The Contractor warned the Consumer that changing the window division, proportions or facade colour may require approval or construction documentation; the decision to keep or change these parameters and to obtain approval is made by the Consumer, who is responsible for it. The Consumer confirms the dimensions, division and colour of the Products in the Specification.

4.4. If hidden defects of the substrate (rot, crumbling masonry, hidden electrical wiring, etc.) are discovered during dismantling, the Contractor immediately notifies the Consumer, records them (photos), suspends work in the affected area and offers a solution with its cost. Work resumes after the Consumer’s written consent (including by email or messaging app); the Consumer is entitled to refuse the additional work and terminate the Contract in accordance with clause 2.6.

4.5. Additional and changed work is paid for only if its scope and price have been agreed in writing before it is performed. The exception is urgent measures to prevent damage to the Consumer’s property whose cost does not exceed 100 EUR; the Contractor reports them immediately.

4.6. Old windows and construction waste are disposed of in accordance with waste management legislation if this is within the scope of work (clause 1.4). On request the Contractor presents proof of disposal.

4.7. The Contractor must be careful with the Consumer’s property and compensate losses caused through its fault or that of its subcontractors during the work. Losses caused by unforeseeable circumstances (hidden substrate defects described in clause 4.4) are not compensated by the Contractor if they could not have been foreseen in an ordinary inspection and the Consumer was warned immediately.

4.8. The Consumer is entitled to monitor the progress and quality of the work at a time convenient for the Parties, without interfering with the Contractor’s professional activity and without breaching safety rules. The Consumer is entitled to make remarks to the Contractor about the progress of the work immediately; the Contractor must take justified remarks into account or explain in writing why they are unfounded.

5. Acceptance of work and transfer of risk

5.1. After installation is completed (or at the moment of delivery / collection of the Products if installation is not provided for) the Consumer, in the presence of the Contractor’s representative, inspects the Products and — if there is any — the result of installation (geometry, operation of hardware, tight fit of the gasket, glazing units, coating, sills, drip caps, cleaning) and signs the Acceptance Certificate (Annex 2). In the case of installation the Contractor notifies in advance that the work is ready for acceptance.

5.2. If defects are found during the inspection, they are recorded in the Certificate with a deadline for remedy (no more than 14 days unless the Parties agree otherwise). Minor defects that do not prevent normal use of the windows do not give the Consumer grounds to refuse to sign the Certificate, but remedying them is mandatory. Signing the Certificate does not deprive the Consumer of rights concerning hidden defects and defects discovered later (Chapter 6).

5.3. When signing the Certificate the Contractor hands over to the Consumer: the Product passport(s) and the user and care instructions (including ventilation and hardware adjustment instructions), the commercial warranty document (clause 6.6), the declaration of performance / CE marking (where applicable) and the receipt / invoice for payment.

5.4. If the Consumer, without a justifying reason, does not attend the acceptance within 5 working days of the notice of readiness, the Contractor is entitled to draw up the Certificate with photographic records and send it to the Consumer by post or email. The Consumer’s silence is not considered consent to the quality of the work: the Consumer is entitled to submit reasoned objections within 14 days, and the deadlines set in Chapter 6 are not shortened.

5.5. Ownership of the Products passes to the Consumer when the price has been paid in full. The risk of accidental loss or damage of the Products is borne by the Contractor until the Acceptance Certificate is signed (including during transport, storage at the Site and — if any — installation), unless otherwise follows from the Consumer’s fault.

6. Conformity with the Contract, warranty and the Consumer’s rights

6.1. The Contractor must ensure that the Products and work conform to the terms of the Contract (CRPL Section 13(1)). The Products conform to the contract if they match the description in the Specification, are fit for the ordinary use of such products, are complete and accompanied by instructions, including on installation (CRPL Section 14).

6.2. Rights provided by law (two years). Within two years of the date of handover of the Products (the result of the work) the Consumer is entitled to submit to the Contractor a claim concerning a lack of conformity with the Contract that existed at the time of handover (CRPL Section 13(2), Section 27(1)). If the lack of conformity is discovered within one year of the handover, it is presumed to have existed at the time of handover, and the Contractor must prove otherwise, unless this is incompatible with the nature of the product (CRPL Section 13(3)). These rights do not depend on the existence or duration of a commercial warranty.

6.3. The Consumer notifies the lack of conformity within a reasonable period after discovering it; this period cannot be shorter than two months (CRPL Section 27). The Contractor may not refuse to consider a claim submitted within this period and within two years.

6.4. Remedies (CRPL Section 28). In case of a lack of conformity the Consumer is first entitled to demand free remedy of the lack of conformity or replacement of the Product (including dismantling and re-installation), if this is possible and not disproportionate. If the Contractor has not remedied the lack of conformity within a reasonable period (the Parties consider 30 calendar days from receipt of the claim to be such a period, unless technically more time is needed, of which the Consumer is informed in writing) or if remedy is impossible, the Consumer is entitled to demand a proportionate price reduction or termination of the Contract with a refund of the amount paid. The costs of remedying the lack of conformity are borne by the Contractor. The Consumer’s costs of delivering the goods are reimbursed within three working days after supporting documents are submitted (CRPL Section 28).

6.5. The claim is submitted in writing (by post or email to the address stated in the Individual Terms); the Contractor considers it and replies in writing within the period set by the CRPL (15 working days, CRPL Section 26.1). If the Contractor refuses or the Consumer is not satisfied with the proposed solution, the Consumer is entitled to apply to the Consumer Rights Protection Centre (PTAC), the Consumer Dispute Resolution Commission, an out-of-court dispute resolution body or a court.

6.6. Commercial warranty (CRPL Section 16; it does not replace the rights provided by law under clause 6.2): the Contractor provides an additional free warranty whose periods (for the profile structure, the tightness of the glazing unit, hardware, installation work) are stated in the Individual Terms, starting from the date of the Acceptance Certificate. The warranty is issued in writing or on another durable medium no later than at the time of handover of the Products, in simple and clear language, and states the conditions for submitting a claim, the period, the name and address of the guarantor, the goods covered by the warranty, as well as a statement that the Consumer’s rights provided by law are not affected. If the manufacturer has given the Contractor information about a durability guarantee longer than two years, the Contractor informs the Consumer about it before the Contract is concluded.

6.7. The following is not considered a lack of conformity: (a) a deviation from characteristics of which the Consumer was informed before the Contract was concluded and to which they expressly agreed in writing (CRPL Section 14(5)); (b) natural wear and tear; (c) damage resulting from improper use contrary to the instructions, mechanical damage or actions of third parties after handover — provided that the Contractor has proved this cause.

6.8. If the Individual Terms state that old windows are being replaced with more airtight ones, the Contractor warns the Consumer that air exchange in the room will decrease and, with insufficient ventilation, this may cause condensation and mould; the Contractor recommends ventilation and air inlet vents, which are offered or ordered — in accordance with the Individual Terms and the Consumer’s decision. This does not limit the Consumer’s rights in the event of defects in the Products or installation.

7. Right of withdrawal from the Contract

7.1. If the Contract is concluded on the Contractor’s premises, there is no statutory right to withdraw from the contract without giving a reason (CRPL Section 12). All of the Consumer’s rights in case of a lack of conformity (Chapter 6) and the right to terminate the Contract in case of a breach by the Contractor (clauses 2.6, 3.4) are preserved. If the Contract is concluded away from the Contractor’s permanent place of business or remotely (as stated in the Individual Terms), all Products are made to the Consumer’s individual order (the dimensions, colour and configuration are determined by the Consumer), therefore the right to withdraw from the Contract within 14 days (CRPL Section 12; Cabinet Regulations No. 254, No. 255) does not apply to the Products (clause 7.2); the Consumer is informed of this in writing before signing the Contract. If installation is included, the Consumer is entitled to withdraw from the installation services within 14 days of the date the Contract is concluded without giving a reason; if at the Consumer’s request installation has begun before this period ends, the Consumer pays proportionally for the part of the work actually performed (clause 7.3). Since installation is not possible without the manufactured Products, the Contractor recommends deciding this question before the order is placed into production.

7.2. Exception for goods made to order. The Products are made according to the Consumer’s instructions and are clearly personalised (non-standard dimensions, colour, configuration). In this case the right of withdrawal does not apply to the Products (Cabinet Regulations No. 254, clause 18.3; No. 255, clause 22.3). The Contractor informed the Consumer of this in writing before the Contract was signed. This exception does not affect the Consumer’s rights under Chapter 6.

7.3. Installation during the withdrawal period. If the Consumer asks for work to begin before the withdrawal period ends, they submit an express written request; if they withdraw later, they pay proportionally for the part of the work already performed (Cabinet Regulations No. 254, clauses 14, 19). If the Contractor has not provided the mandatory information about withdrawal or has not received such a request, the Consumer does not pay for the services (Cabinet Regulations No. 254, clause 20).

7.4. How to withdraw. By any unambiguous statement (a letter or email to the address stated in the Individual Terms) or using the form in Annex 3 (use of the form is not mandatory). The period is met if the notice is sent before it expires; the burden of proving that it was sent lies with the Consumer (CRPL Section 12(2)), so it is advisable to keep proof of sending.

7.5. Consequences of withdrawal. The Contract terminates from the moment the notice is sent (CRPL Section 12(4)). The Contractor refunds all payments without undue delay, no later than 14 days after receiving the notice, in the same way as the payment was made, without additional commission fees. The Contractor may withhold the refund until the goods are received back or proof of their dispatch is provided (CRPL Section 12(8)). If the Products have already been delivered, the Consumer returns them within 14 days after the notice of withdrawal; the return costs are borne by the Consumer unless otherwise agreed (CRPL Section 12(9)).

7.6. If the Contractor has not provided the Consumer with the mandatory information about the right of withdrawal, the withdrawal period is extended by one year after the end of the original period (Cabinet Regulations No. 254, clauses 16–17).

8. Liability of the Parties, penalty, termination

8.1. The Parties are liable for breach of the Contract in the manner provided by law and the Contract. A contractual penalty must be proportionate and consistent with good faith practice (Civil Law Section 1717); a court may reduce an excessive penalty (Civil Law Section 1724¹).

8.2. For late delivery or installation, or late refund, the Contractor pays the Consumer a penalty of 0.1 % per day of the price of the unperformed part (or of the unrefunded amount), but not more than 10 %. Payment of the penalty does not release a Party from performing the obligation and from compensating losses to the extent not covered by the penalty.

8.3. Nothing in the Contract limits the Contractor’s liability for harm to the Consumer’s life or health, for intentional or grossly negligent acts, nor deprives the Consumer of the right to make claims in case of non-performance or improper performance of the Contract.

8.4. A Party is released from liability if the breach was caused by force majeure circumstances that it could neither foresee nor prevent (natural disasters, acts of state authorities, fire, etc.). The Party notifies the other Party within 5 working days; deadlines are extended for the duration of these circumstances. Delays by the Contractor’s suppliers, manufacturer or subcontractors are not force majeure. If the circumstances last longer than 60 days, either Party is entitled to terminate the Contract; the Contractor refunds the prepayment for the unperformed part.

8.5. The Consumer is responsible for the accuracy of the Site data, for the existence of consents (clause 4.3) and for access to the Site, as well as for losses caused through the Consumer’s fault to the Contractor or its employees.

8.6. The Contractor is entitled to terminate the Contract only in case of a material breach by the Consumer (for example, non-payment within 14 days after a written warning, failure to provide access to the Site twice in a row), after warning in writing; termination of the Contract without a justifying reason is not permitted. In this case mutual settlements — in accordance with clause 2.6.

9. Personal data, disputes and general provisions

9.1. Personal data. The data controller is SIA «Saens». The Consumer’s data (name, address, contact information, data about the Site and payments) is processed for concluding and performing the Contract, warranty service and bookkeeping in accordance with Regulation (EU) 2016/679 (GDPR) and the Law on Processing of Natural Persons’ Data. The data is kept no longer than necessary for these purposes or as provided by law. The Consumer is entitled to access the data, request its rectification, erasure, restriction of processing, object to processing and lodge a complaint with the Data State Inspectorate (dvi.gov.lv). The Privacy Policy is available on the website and on request at the Contractor’s office.

9.2. Disputes. Disputes are resolved by negotiation; the Consumer’s written submission is considered in accordance with clause 6.5. If the dispute is not resolved, the Consumer is entitled to apply to the Consumer Rights Protection Centre (PTAC, ptac.gov.lv), the Consumer Dispute Resolution Commission, another out-of-court dispute resolution body or a court in the manner provided by the Civil Procedure Law. The Contract contains no arbitration clause and does not limit the Consumer’s right to apply to these institutions (CRPL Section 6(3), Section 7).

9.3. Applicable law — the legislation of the Republic of Latvia.

9.4. Language. The Contract is drawn up in Latvian and Russian. The basic (prevailing) version is the Latvian version; the Russian text is provided for the Consumer’s convenience. Information for the consumer (Annex 1), warranty documents and instructions are also provided in Latvian. In case of discrepancies between the texts, the Latvian version prevails.

9.5. Notices are sent in writing (post, email) to the addresses stated in the Individual Terms. An email is considered received on the day of sending if no delivery error notification is received; a registered letter — on the 7th day after sending. Mandatory notices (about withdrawal, termination, a claim) may be duplicated by phone or messaging app, but a phone message does not by itself replace them.

9.6. Amendments. The Contract is amended only by written agreement of both Parties. A unilateral change of the Contract terms, the price or the characteristics of the Products without the Consumer’s consent is not permitted.

9.7. Partial invalidity. If any provision is found invalid, the other provisions remain in force; a provision that conflicts with mandatory consumer protection rules is not applied (CRPL Section 6(8)).

9.8. Term. The Contract enters into force upon signing and remains in force until the obligations are fully performed; warranty obligations remain in force until the end of the stated periods.

9.9. Signing and copies. The Contract is drawn up in two copies (one for each Party) or signed electronically (with a secure electronic signature). The Contract may also be concluded remotely: the Contractor sends the Consumer the text of the Contract (the Individual Terms, these General Terms, the information for the consumer and the warning that there is no right of withdrawal for Products made to order) to the email address stated in the Individual Terms, and the Consumer confirms it with a secure electronic signature or an unambiguous written confirmation from that email address. A copy is given to the Consumer on paper or on a durable medium of their choice (Cabinet Regulations No. 254, clause 12). The Individual Terms (with the Specification and the payment schedule) and the annexes to these General Terms are an integral part of the Contract.

Annex 1. Information for the consumer before the Contract is concluded

This information is given to the Consumer on paper or on a durable medium before signing, in simple and clear language, and is confirmed by signature (Cabinet Regulations No. 254, clauses 5, 11; No. 255, clause 5).

  • Main characteristics of the Products and work — Individual Terms.
  • The Contractor: name, reg. No., registered and actual address, phone, email — Individual Terms.
  • Total price including VAT and all fees, delivery costs — clause 2.1.
  • Payment terms, delivery and installation deadlines, complaint handling procedure — clause 2.3, Chapter 3, clause 6.5.
  • Amount of the prepayment and the conditions for its refund — clauses 2.3, 2.6.
  • Right of withdrawal: conditions, period, procedure, withdrawal form (Annex 3), return costs; exception for goods made to order — Chapter 7.
  • The Consumer’s rights provided by law: the right to submit, within two years of the date of delivery of the goods, a claim about goods that do not conform to the contract (clauses 6.2–6.4).
  • Warranty and after-sales service — clause 6.6.
  • Out-of-court dispute resolution — PTAC, Consumer Dispute Resolution Commission — clauses 6.5, 9.2.
  • Term of the Contract and grounds for termination — clauses 2.6, 3.4, Chapter 8.

Annex 2. Acceptance Certificate

Contract No. ________ dated ________. Site: ________. Date and place of acceptance: ________.

The Contractor has handed over, and the Consumer has accepted, the Products and the work performed. In the presence of both Parties the following was checked:

  • quantity, dimensions and completeness correspond to the Specification
  • profile, glazing units and coating have no visible damage
  • hardware works, even pressure is ensured
  • sills, drip caps and window reveals are installed and sealed
  • work area cleaned, waste removed
  • Product passport, user instructions, warranty and DoP / CE handed over

Consumer’s remarks: ________. Deadline for remedy: ________.

Signing the Certificate does not deprive the Consumer of rights under Chapter 6 of the Contract.

Contractor: ____________ / Consumer: ____________

Annex 3. Model notice of withdrawal from the contract

Use of this form is not mandatory: any unambiguous statement is sufficient. If you wish to withdraw from the contract and you have a right of withdrawal (Chapter 7), fill in and send it.

To: SIA «Saens», Slāvu iela 2a, Daugavpils, LV-5417, email: [email protected].

I hereby give notice that I withdraw from contract No. ________ for the purchase and installation of the following goods / services: ________.

Ordered / received on (delete as appropriate): ________.

Consumer’s name: ________. Consumer’s address: ________.

Consumer’s signature (only if this notice is sent on paper): ________. Date: ________.